INSTYTUT MATEMATYKI
Uniwersytet ¦l±ski
40-007 Katowice, ul. Bankowa 14

tel/fax (032) 2582976
e-mail:im@ux2.math.us.edu.pl



Paweł Błaszczyk – scientific papers

  1. K. St±por, A. Bruckner, P. Błaszczyk, A comparative review of selection methods for discovering differentially expressed genes in microarray experiments for classification, Studia Informatica (2006), vol. 27 no. 4(69).
  2. K. St±por, P. Błaszczyk, A. Bruckner, Discriminant analysis and multiple hypothesis testing for the classification of high-dimensional microarray data, Konferencja Zastosowań Matematyki, Zakopane 2006.
  3. P. Błaszczyk, K. St±por, Porównanie sprawno¶ci klasyfikacji danych mikromacierzowych za pomoc± Liniowej Dyskryminacji Fishera (FLD) oraz metody Cz±stkowych Najmniejszych Kwadratów (PLS), Studia Informatica (2007), vol. 28, no. 2(71).
  4. P. Błaszczyk, K. St±por, Maximum Separation Partial Least Squares (MSPLS): A new method for classification in microarray experiment, Journal of Medical Informatics and Technologies 2007.
  5. P. Błaszczyk, K. St±por, A new feature extraction method based on the Partial Least Squares algorithm and its applications, Advances in Intelligent and Soft Computing, Volume 57, 179-186, Springer 2009.
  6. P. Błaszczyk, T. Baszczyk, M. B. Kania, Task duration buffers versus work amount buffers. The first Earned Value Analysis Conference for the Continental Europe (proceedings), 1 (1), CERN Geneva 2009, 345-375.
  7. P. Błaszczyk, T. Baszczyk, M. B. Kania, Dwukryterialna Analiza projektu modelowanego z uwzględnieniem buforów czasowych i kosztowych. In: Trzaskalik T. (ed.) Modelowanie Preferencji a Ryzyko 2010, Katowice 2010, 185-196.
  8. P. Błaszczyk, T. Błaszczyk, M. B. Kania , The bi-criterial approach to project cost and schedule buffers sizing, Lecture Notes in Economics and Mathematical Systems, New state of MCDM in the 21st century, Vol 648, Part 3, 105-114, Springer 2011.
  9. P. Błaszczyk, A new tool for feature extraction and its application to credit risk analysis, Lecture Notes in Economics and Mathematical Systems, New state of MCDM in the 21st century, Vol 648, Part 3, 131-141, Springer 2011.
  10. T. Wachowicz, T. Błaszczyk, P. Błaszczyk, The Even-Swap Based Scoring System And Its Application To Selection Of Heating Source For Individual House Building Project, Int. J. of Applied Management Science, submitted.
  11. P. Błaszczyk, Robust tool for feature extraction and its application, IEEE IEEM International Conference on Industrial Engineering and Engineering Management, 2010 IEEE International Conference on, 352-356.
  12. P. Błaszczyk, Feature extraction and classification in Pattern recognition and their application in economy,
  13. T. Wachowicz, P. Błaszczyk, TOPSIS Based Negotiation Offers’ Scoring Approach For Negotiation Support Systems, accepted.
  14. P. Błaszczyk, T. Błaszczyk, M. B. Kania, Theoretical foundations of fuzzy bi-criterial approach to project cost and schedule buffers sizing, Lectures Notes on Engineering and Computer Science, Vol 2194, 1121-1125, 2011.
  15. P. Błaszczyk, T. Błaszczyk, M. B. Kania, IAENG Transactions on Engineering Technologies, IAENG Transactions on Engineering Technologies 2012, chapter 30.
  16. P. Błaszczyk, T. Błaszczyk, M. B. Kania, Dwukryterialny rozmyty model łańcucha krytycznego – podstawy teoretyczne, Studia Ekonomiczne - Analiza i wspomaganie decyzji pod redakcją prof. dr hab. D. Kopańskiej-Bródki, 2013, 9-25
  17. P. Błaszczyk, T. Błaszczyk, „New formal approach to project critical buffer”, IEEE IEEM International Conference on Industrial Engineering and Engineering Management, 2012 IEEE International Conference on, 1070-1074, 2012
  18. P. Błaszczyk, T. Błaszczyk, „Assessment of the risk of the project's contractor bankruptcy using the Partial Least Squares approach”, Procedia Technology 2013(9), 777 - 786
  19. P. Błaszczyk, T. Błaszczyk, „Project subcontractors selection in fixed price and cost-plus contracts”, Lecture Notes in Engineering and Computer Science, in Proceedings of The World Congress on Engineering and Computer Science 2013, WCECS 2013, 23–25 Oct, 2013, San Francisco, USA, pp. 1131–1136
  20. P. Błaszczyk, T. Błaszczyk, „Selection of sub-contractors of the project while minimizing settlements of contractual penalties and success fees”, IEEE IEEM International Conference on Industrial Engineering and Engineering Management, 2013 IEEE International Conference on, 1689 – 1693.
  21. P. Błaszczyk, T. Błaszczyk, K. Tyła, „Project schedule optimization by critical chain approach in fuzzy environment”, Lecture Notes in Engineering and Computer Science 2014, 92-96.
  22. P. Błaszczyk, T. Błaszczyk, „Examination the usefulness of selected classification methods in the pre-qualification of construction contractors”, International Journal of Information Technology Project Management Vol. 8, Issue 1, 17-34, 2017
  23. P. Błaszczyk, T. Błaszczyk, „Models supporting project subcontractors selection for Main Types of Contracts”, Transaction on Engineering Technologies 2014, 781-796.
  24. P. Błaszczyk, T. Błaszczyk, „The draft of the system supporting purchasing decision making in project management processes”, Global Interdisciplinary Business-Economics Advancement Conference (GIBA 2014) Proceedings, Edited by Cobanoglu C., Ongan S, 01/2014: chapter The draft of the system supporting purchasing decision making in project management processes: pages 827-833;
  25. P. Błaszczyk, T. Błaszczyk, „On the support of the general contractor's decisions in the process of event project management", Book chapter no 11 in: Camillo, A. A., (Ed), Vol. I., ISBN 9781137429582, (2015). “Global Enterprise Management: A New Perspective on Challenges and Future Development. NY, NY: Palgrave McMillan.
  26. P. Błaszczyk, T. Błaszczyk “The concept of project time management with fuzzy buffers approach”, IAENG Transactions on Engineering Sciences, 315-326
  27. T. Blaszczyk, P. Błaszczyk "Contracting decisions in project management - an outline of the dedicated decision support system", Industrial Engineering, Management Science and Applications 2015, Lecture Notes in Electrical Engineering Volume 349, 2015, pp 347-356
  28. T. Błaszczyk, P. Błaszczyk "A new model of the decision support system for the projects' bid configuration with multiple sub-contractors", Lecture Notes in Engineering and Computer Science: Proceedings of The World Congress on Engineering and Computer Science 2015, WCECS 2015, 21-25 October, 2015, 1024-1030
  29. P. Błaszczyk "Semi-supervised Feature Extraction Method Using Partial Least Squares and Gaussian Mixture Model", Lecture Notes in Engineering and Computer Science: Proceedings of The World Congress on Engineering and Computer Science 2015, WCECS 2015, 21-25 October, 2015, 802-807
  30. T. Błaszczyk, P. Błaszczyk “Complete Bid Configuration. Supporting the Process from the Perspective of the General Contractor”, Transactions on Engineering Technologies, chapter 33
  31. P. Błaszczyk “Semi-supervised Classification with Modified Kernel Partial Least Squares”, Transactions on Engineering Technologies, chapter 8
  32. P. Błaszczyk, T. Błaszczyk, M. Nowak, „A new interactive approach to negotiations with projects subcontractors”, przyjęta do druku
  33. P. Błaszczyk, T. Błaszczyk, “Procurement decisions in project management processes - result of an industrial questionnaire survey”, przyjęta do druku


    Upadated: 24.10.2016